PFProfitFlow Tools

ARTICLE 50 · FINAL-WEEK IMPLEMENTATION BRIEF

Four transparency cases.
Route the right one.

The EU AI Act's Article 50 transparency rules apply from 2 August 2026. This independent checklist separates provider and deployer work so a chatbot notice is not mistaken for synthetic-content marking—and a voluntary Code decision is not mistaken for compliance itself.

Source-checked 30 July 2026 · five printable A4 pages · no signup · planning aid, not legal advice

THE FIRST CONTROL

Separate legal role,
content trigger,
and evidence.

The Commission's new Q&A describes four situations. The responsible actor, required action, exceptions, and evidence route differ. Start by recording uncertainty instead of forcing every use into one generic “AI label” task.

Read the official Article 50 Q&A ↗

FOUR CASES · TWO PRIMARY ROLES

Use the trigger, not the product name.

One system may create more than one workstream. These cards are routing prompts; the current Regulation, official guidelines, and facts decide the scope.

01PROVIDER

A person interacts directly with an AI system

Inform the person that they are interacting with AI no later than the first interaction, unless this is obvious to a reasonably well-informed, observant and circumspect person.

EVIDENCE ROUTEFirst-interaction capture · copy approval · exception rationale
02PROVIDER

AI-generated or manipulated synthetic content

Mark outputs in a machine-readable format and make them detectable as artificially generated or manipulated, subject to the Regulation's technical and proportionality conditions.

EVIDENCE ROUTEMarking method · detection test · technical limitation record
03DEPLOYER

Emotion recognition or biometric categorisation

Inform exposed natural persons that the system is operating, and handle personal data in line with applicable data-protection requirements.

EVIDENCE ROUTENotice placement · audience coverage · data-protection route
04DEPLOYER

Deepfakes or certain public-interest text

Disclose artificial generation or manipulation. For public-interest text, the human review or editorial-control exception and accountable party matter.

EVIDENCE ROUTELabel specimen · publishing control · exception decision

SIX CONTROLLED MOVES

A final-week sprint that leaves an audit trail.

Work from the live system outward. A policy sentence without a tested customer or publishing surface is still an open task.

01

Inventory

List the system, output type, audience, provider/deployer role, launch surface, and owner.

02

Route

Assign each use to case 01, 02, 03, 04, multiple cases, or unresolved—with the reason visible.

03

Implement

Place the interaction notice, machine-readable mark, exposed-person notice, or content label in the actual journey.

04

Test

Capture first interaction, accessibility, localisation, output marking, label visibility, and exception behaviour.

05

Retain

Store the approved copy, test date, limitation, owner, source version, and evidence reference—not personal data.

06

Decide

Keep the voluntary Transparency Code signing decision separate from the underlying Article 50 work.

DO NOT MERGE THESE DATES

27 July is not the Article 50 application date.

The 27 July 18:00 CEST time is the cut-off for inclusion in the initial public list of Transparency Code signatories. Signing is voluntary and remains possible later. The Article 50 transparency obligations apply from 2 August 2026.

Run the private signatory-readiness check →

DO NOT GENERALISE THE GRACE PERIOD

2 December is a narrow transition.

The official Q&A describes a transition for the Article 50(2) machine-readable marking obligation for qualifying systems placed on the market before 2 August. It is not a four-month delay for every Article 50 duty.

Check the official conditions ↗

FREE → EDITABLE → IMPLEMENTABLE

Take only the layer your team is missing.

FREE · PRINTABLE PDF

72-Hour Go-Live Packet

Route the four cases, control the T-72 to T-0 cutover, record the release decision, and retain inspectable evidence.

Download the five-page packet →
$39 · OPERATIONS

Launch Kit

Eight connected sheets, ten final-guideline QA scenarios, and an editable playbook for inventory, notices, evidence, literacy, and incident review.

Inspect the Launch Kit →
$69 · THREE WORKSTREAMS

Sprint Bundle

Add the React disclosure components, official EU icon files, and the offline signatory-readiness room.

Inspect the Sprint Bundle →

CONTROLLING PUBLIC SOURCES

Recheck before launch.

Official guidance can change. Use these links to validate the live position, scope, exceptions, and technical detail before acting.

01Article 50 transparency obligations Q&ACommission Q&A published 24 July 202602Guidelines for providers and deployersOfficial guidelines published 20 July 202603Article 50 transparency rules — quick factsFour-case official overview updated 20 July 202604Transparency Code signing FAQVoluntary signing and initial-list cut-off